In the process of a total replacement, we start by marking the patch, saw-cut, remove the asphalt, and then we inspect the base. If the base has failed we remove binder, stone, etc. The next step is to compact stone or base, once compacted, we install hot-mix asphalt. If asphalt is more than three inches in depth, we install in equal lifts, compact each lift as installed. Making sure each patch is level and flush.

Band aid patching: We clean the area, tack edges, rake, and grade asphalt to taper down on edges. Roll and compact asphalt. However, we do not recommend this method for a long term fix.

Other services included with patching:

  • Traffic control to ease impact on customers
  • Job site management
  • Post job clean-up
  • Post job barricade